Select the quotation questions you need to review. The table distinguishes the sample and drawing basis, equipment schedule, exit handling, initial consumables, timing scope, site duties and acceptance responsibilities. A quoted machine capacity or price does not show whether loading, drying, inspection or optional accessories are included. The tool brings the evidence requests and open issues together; it does not rank suppliers or calculate a return on investment.
Select the entries relevant to your review.
Quotation questions without price, ROI or supplier-rating inference. Keep every selected requirement with the part and the actual trial record. Selecting a row does not show that its acceptance condition has been met.
Use the same drawing revision, representative parts and inspection criteria for every proposal. Record which variants have not been trialled and which site requirements remain open. Separate observed trial time from estimates, and identify the start and end of each timing statement. Confirm responsibilities for utilities, installation, consumables and final acceptance with the supplier. A single successful sample does not establish repeatable production performance.
Evidence to request: Drawing revision, representative samples and agreed inspection criteria
Open issue to record: Untested variants or undefined acceptance limits
Evidence to request: Itemized machine and accessory schedule
Open issue to record: Optional equipment excluded from the total
Evidence to request: Separation, rinsing, drying and handling description
Open issue to record: Manual steps, handling marks or retained media needing investigation
Evidence to request: Media and compound identification, initial supply and replenishment basis
Open issue to record: Future consumption not yet measured
Evidence to request: Defined start/end points, batch quantity and observed trial conditions
Open issue to record: Loading, drying or inspection excluded from the estimate
Evidence to request: Site utility and installation requirements for the quoted configuration
Open issue to record: Electrical, water, drainage, extraction or floor-space details not yet reviewed
Evidence to request: Agreed evidence, inspection method, responsibilities and unresolved exceptions
Open issue to record: A result demonstrated only on one sample or one trial
Read the Jintaijin technical article. Source table reviewed 3 October 2026. Possible causes, directions and adjustments remain conditional reference fields.
Email : info@surface-polish.com